Answer (D) is correct . Prime costs are direct materials and direct labor. They are directly identifiable elements of production costs and are directly traceable to the product.
Answer (A) is incorrect because Some overhead costs are variable but cannot be directly traced to a particular product. Answer (B) is incorrect because It includes costs that cannot be directly traced. Answer (C) is incorrect because It includes costs that cannot be directly traced.
|