C is corrent. The total cost would equal the average cost multiplied by the number of units, or $258.02 (7 X $36.86).
A is incorrect. Total cost is equal to average total cost times the number of units.
B is incorrect. Total cost is equal to average total cost times the number of units.
D is incorrect. Total cost is equal to average total cost times the number of units.
|