The correct answer is:When absorbed overheads exceed actual overheads
When absorbed overheads exceed budgeted overheads could lead to under-absorbed overheads if actual overheads far exceeded both budgeted overheads and the overhead absorbed.
When actual overheads exceed absorbed overheads could lead to under-absorbed overheads if overhead absorbed does not increase in line with actual overhead incurred.