
微信扫一扫
实时资讯全掌握
An auditor may decide to increase the risk of incorrect rejection when A. The cost and effort of selecting additional sample items is low. B. Initial sample results do not support the planned level of control risk. C. Many differences (audit value minus recorded value) are expected. D. Increased reliability from the sample is desired. |