
微信扫一扫
实时资讯全掌握
In planning a statistical sample for a test of controls, an auditor increased the expected population deviation rate from the prior year’s rate because of the results of the prior year’s tests of controls and the overall control environment. The auditor most likely would then increase the planned A. Tolerable rate. B. Risk of assessing control risk too low. C. Sample size. D. Allowance for sampling risk. |