
微信扫一扫
实时资讯全掌握
A total cost is described as staying the same over a certain activity range and then increasing but remaining stable over a revised activity range in the short term. What type of cost is this? A. A variable cost B. A stepped fixed cost C. A semi-variable cost D. A fixed cost |