
微信扫一扫
实时资讯全掌握
A difference between standard costs used for cost control and the budgeted costs of the same manufacturing effort can exist because A. Standard costs represent what costs should be, whereas budgeted costs are expected actual costs. B. Budgeted costs are historical costs, whereas standard costs are based on engineering studies. C. Budgeted costs include some slack, whereas standard costs do not. D. Standard costs include some slack, whereas budgeted costs do not. |