
微信扫一扫
实时资讯全掌握
Swan Co has always operated a standard costing system for production, and uses variance analysis to identify any deviations from budget. Information with respect to variable overhead costs (absorbed on a direct labour hour basis) for the period was as follows.![]() What was the variable overhead expenditure variance? A $11,500 adverse B $20,393 adverse C $23,500 adverse D $23,500 favourable |