
微信扫一扫
实时资讯全掌握
Which of the following is the least appropriate action to take if the specified risk tolerance threshold is exceeded? A. Implementation risk: change the tactical asset allocation. B. SAR: change the strategic asset allocation. C. Active risk at the manager level: replace highly correlated managers with managers having lower correlations. D. Active risk at the plan level: institute an overlay program. |