
微信扫一扫
实时资讯全掌握
What is an auditor’s evaluation of a statistical sample for attributes when a test of fifty documents results in three deviations if tolerable rate is 7%, the expected population deviation rate is 5%, and the allowance for sampling risk is 2%? A. Modify the planned assessed level of control risk because the tolerable rate plus the allowance for sampling risk exceeds the expected population deviation rate. B. Accept the sample results as support for the planned assessed level of control risk because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate. C. Accept the sample results as support for the planned assessed level of control risk because the tolerable rate less the allowance for sampling risk equals the expected population deviation rate. D. Modify the planned assessed level of control risk because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate. |
暂无解析 |