The following information is available for two bonds:
Bond X is callable and has an option-adjusted spread (OAS) of 55bp. Similar bonds have a Z-spread of 68bp and a nominal spread of 60bp.
Bond Y is putable and has an OAS of 100bp. Similar bonds have a Z-spread of 78bp and a nominal spread of 66bp.
The embedded option cost for Bond:
Option cost (Bond X) = Z-spread – OAS = 68bp – 55bp = 13bpOption cost (Bond Y) = Z-spread – OAS = 78bp – 100bp = - 22bp
微信号:gaoduntiku
合作账户登录:
账户名:
密码:
关注官方微信
微信号:gaoduneclass
高顿网校
售前咨询(9:00-21:00)
400-168-8811
在线客服点击咨询
售后咨询(9:00-21:00)
021-31068088
fankui@gaodun.com
微信扫一扫实时资讯全掌握
Copyright © 2006- 高顿网校, All Rights Reserved.