If you selected $330,300 you did not include a fixed cost allowance for the other overhead.
$373,300 ignores the fact that production overhead is a semi-variable cost and $377,300 simply multiplies the total cost for 70% activity by a factor of 1.1. This makes no allowance for the fact that there is an element of fixed costs within production overhead, and other overhead is wholly fixed.