Corrigon Industries is preparing a bid for a special project requiring the production of 35,000?units. The engineering personnel have advised that the units can be produced in groups with the first group consisting of 1,000 units. A review of prior experience indicates that the direct labor time needed per unit will be progressively smaller by a constant percentage rate as experience is gained in the production process. The quantitative method that would best estimate Corrigon’s total cost for the project is A. Linear programming. B. Dynamic programming. C. Learning curve analysis. D. Time series analysis. |