
微信扫一扫
实时资讯全掌握
Which of the following is an element of sampling risk? A. Failing to detect an error on a document that has been inspected by the auditor. B. Choosing a sample size that is too small to achieve the sampling objective. C. Choosing an audit procedure that is inconsistent with the audit objective. D. Failing to perform audit procedures that are required by the sampling plan. |