Water Control Inc. manufactures water pumps and uses a standard cost system. The standard factory overhead costs per water pump are based on direct labor hours and are as follows: Variable overhead (4 hours at $8/hour) - $32 Fixed overhead (4 hours at $5/hour*) - $20 Total overhead cost per unit - $52 * Based on a capacity of 100,000 direct labor hours per month.
The following additional information is available for the month of November:
22,000 pumps were produced although 25,000 had been scheduled for production. 94,000 direct labor hours were worked at a total cost of $940,000. The standard direct labor rate is $9 per hour. The standard direct labor time per unit is 4 hours. Variable overhead costs were $740,000. Fixed overhead costs were $540,000.
The fixed overhead spending variance for November was
A. $40,000 unfavorable. B. $70,000 unfavorable. C. $240,000 unfavorable. D. $460,000 unfavorable.
|