The accuracy of a value at risk (VAR) measure: A. is included in the statistic. B. can only be ascertained after the fact. C. is one minus the probability level.
This is a weakness of VAR. The reliability can only be known after some time has passed to see if the number and size of the losses is congruent with the VAR measure.