
微信扫一扫
实时资讯全掌握
Which THREE of the following statements in relation to standard costing and performance standards are true? □ A standard cost is a planned unit cost. □ Basic standards are kept unaltered over a long period of time. □ Standard costing can be used to evaluate inventory. □ Attainable standards do not attempt to improve on current levels of efficiency. □ Standard costs can only be used in absorption costing. |