当前位置:高顿题库 >题目详情

题目解析

 

The controller for Durham Skates is reviewing the production cost report for July. An analysis of direct materials costsreflects an unfavorable flexible budget variance of $25. The plant manager believes this is excellent performance on flexible budget for 5,000 units of direct materials. However, the production supervisor is not pleased with this result because he claims to have saved $1,200 in materials cost on actual production using 4,900 units of direct materials. The standard materials cost is $12 per unit. Actual materials used for the month amounted to $60,025.The actual average cost per unit for materials was


 

A. $12.00

B. $12.24

C. $12.01

D. $12.25

  • 答案解析:
    登录之后可查看解析
  • 统       计:共计0人答过,平均正确率0%
  • 问       题:进入高顿部落发帖帮助

相似题型

热门网课更多>>

论坛精华更多>>

题库APP下载更多>>

关注我们

微信号:gaoduntiku

登录手机注册

合作账户登录:      

资料修改成功
失败提示失败提示
资料修改成功
失败提示失败提示
当前号码已不用/丢失,或无法收到验证码? 联系技术支持拨打电话 021-60896660
用户服务协议

高顿网校试题纠错

为方便我们排查错误,请您详细描述本题错误,例如:
还可以输入100

同学

加入你感兴趣的讨论群

售前咨询(9:00-21:00)
400-168-8811
售后咨询(9:00-21:00)
021-31068088

关注官方微信

微信号:gaoduneclass

售前咨询(9:00-21:00)

400-168-8811

在线客服点击咨询

售后咨询(9:00-21:00)

021-31068088

在线客服点击咨询

fankui@gaodun.com

微信扫一扫
实时资讯全掌握

点击即可拨打
400-168-8811

请把您的意见告诉我们

反馈内容:(*必填)

上传图片:
+上传 上传本地图片,图片大小不超过5M

Copyright © 2006- 高顿网校, All Rights Reserved.

沪ICP备 10004469 可信网站认证 诚信网站认证 上海市互联网举报中心 网络社会证信网 安全联盟认证 电脑管家认证