Answer (D) is correct . The Production Planning Department uses a production order to authorize the Production Department to manufacture a specific product.
Answer (A) is incorrect because The daily production schedule is used to plan a variety of manufacturing activities. Answer (B) is incorrect because A raw materials requisition is sent from the Production Department to inventory control to obtain materials needed for production. Answer (C) is incorrect because A bill of materials is a list of the components in a particular product.
|