In the short run, if price is below average total cost (ATC) the firm will: A. keep running as long as it is covering its variable costs. B. raise prices. C. produce more.
In the short run, if the firm is covering its average variable costs and some of its fixed costs it will continue to operate as long as the situation is temporary.